6-lane tunnel at Khambatki Ghat on Pune-Satara highways to be completed by next March

Gadkari said the tunnel is going to enhance connectivity and most importantly, provide direct benefits to the commuters through their Value Over Time (VOT) and Value Over Cost (VOC) savings.

The new 6-lane tunnel at Khambatki Ghat on Pune-Satara highways (NH-4) is a twin tunnel with 3 lanes each

New Delhi: The new 6-lane tunnel at Khambatki Ghat on Pune-Satara highways (NH-4) is a twin tunnel with 3 lanes each and currently under construction is in full progress informed Union Minister for Road Transport and Highways Nitin Gadkari in a series of tweets.

He said the existing ‘S’ curve in Satara-Pune direction shall be completed soon that would lead to drastic reduction in accident risks. The total capital cost for the 6.43 km long project is approximately Rs 926 Crore and is expected to be completed by March 2023.

Gadkari said, our country is witnessing unprecedented infrastructural transformation under the leadership of Prime Minister Narendra Modi and unfolding ‘Prosperity Through Connectivity’. He said New India Demands World Class Infrastructure.

Gadkari said the tunnel is going to enhance connectivity and most importantly, provide direct benefits to the commuters through their Value Over Time (VOT) and Value Over Cost (VOC) savings.

The Minister said average travel time at Pune-Satara and Satara – Pune stretch through Khambataki Ghat is 45 minutes and 10-15 minutes respectively. With the completion of this tunnel, average travel time shall be reduced to 5-10 minutes.

Related posts

Former driver of Prajwal Revanna, who gave pendrive to BJP leader, goes missing

Lookout notice issued against Prajwal Revanna, Karnataka minister cites arrest if he fails to appear before cops

Delhi Lieutenant Governor removes 223 contractual employees of DCW